Skip to content

Logistics · Modernization

Modernizing a logistics core with zero downtime.

Sector
Logistics
Timeline
Multi-month build
Team
Senior, founder-led
Engagement
Modernization → operate
Lower ops costzero downtime

The problem

A load-bearing legacy system was expensive to run and impossible to change safely, but it moved real freight every minute and could not go offline.

The engineering challenge

Replace the core incrementally without a big-bang cutover, keeping data consistent across old and new while the business kept running.

The solution

We wrapped the legacy system, routed traffic through a facade, and replaced capabilities one at a time behind it — measuring each with telemetry before removing the old path. Cost fell as workloads moved to right-sized services.

Architecture

Technology

Chosen for this workload — the load, the team, and the ten-year cost.

GoPostgreSQLKafkaTerraformAWS

The result

Lower ops cost
as workloads right-sized
Zero
downtime through cutover
More frequent
safe deploys

Start

Have a system like this?

Tell us the hard part — we'll come back with a technical point of view.

Or email hello@iyc.global